Trace Reallocated Costs
Learn how to trace a posted project entry back to the run and rule that created it.
Reallocated costs are only useful when people trust them. A project manager who sees an overhead charge on their project wants to know where it came from and how it was calculated. An auditor wants to see that a posted amount matches what the rule calculated, or who changed it.
Pryme Cost Reallocation keeps this link for every posted entry. Each Project Ledger Entry that a run created carries the run number, and from the run you can get to the rule, the period and the source filter.
Learn how to see the run, rule and calculated amount behind a posted project entry.
1 - Trace an Allocation Back to its Source
Learn how to see the run, rule and calculated amount behind a posted project entry.
The Reallocation Trace FactBox on the Project Ledger Entries page shows whether a posted entry was created by a reallocation run, and how. You do not need to leave the page or search for the run.
To trace a posted entry
- Choose the 🔎 icon, enter Projects, and then choose the related link.
- Select a project, and then choose Ledger Entries.
- Select an entry.
- In the FactBox pane, look at the Reallocation Trace FactBox.
The FactBox shows the following for an entry that a run created:
Reallocation Run No. - The run that created the entry. Choose the value to open the run.Rule Code - The rule that was run. Choose the value to open the rule.Period Start Date and Period End Date - The period that the run allocated costs for.Reallocation Line Type - Destination for cost brought to the project, or Source Reversal for cost moved off the project.Reallocation System Amount - The amount that the run calculated.Reallocation Adjusted - Selected when someone changed the amount on the journal line before it was posted.
For any other entry, the FactBox shows This entry was not generated by a Cost Reallocation run.
Tip
Compare the Reallocation System Amount with the Total Cost (LCY) of the entry. When they differ, the line was adjusted in the journal before posting, and Reallocation Adjusted is selected.Find all entries from a run
To go the other way, from a run to all of its posted entries:
- Choose the 🔎 icon, enter Reallocation Runs, and then choose the related link.
- Select a posted run.
- Choose Posted Entries.
The Project Ledger Entries page opens, filtered to the entries that the run created, on all destination and source projects.