Allocation Methods
3 minute read
The allocation method decides how the source total is split between the destination projects. Each project’s share is based on that project’s own activity in the same period, so busy projects carry more of the shared cost than quiet ones.
Set the method in the Allocation Method field on the Destination FastTab of the rule. A rule must have a method before it can be run.
When to use it
Use Cost Based when:
- The shared cost grows with the overall volume of project spending, for example procurement, finance or general administration.
- Your projects are mostly material- or subcontractor-driven, and hours are not a good measure of activity.
Use Hours Based when:
- The shared cost grows with the number of people working, for example office space, IT equipment or HR.
- Your projects are mostly labour-driven, and you post resource time to them.
Cost Based
Each destination project’s share is in proportion to its own usage cost in the period.
- The basis is the
Total Cost (LCY)of usage entries posted to the project, with a posting date in the period. - Projects with no positive usage cost in the period get no share, and no journal line.
- If none of the destination projects have usage cost in the period, the run creates no journal lines and tells you that there is no cost basis.
Formula
Project share = Source total × Project usage cost ÷ Total usage cost of all destination projects
Example
The source total is 10,000.00.
| Project | Usage cost in the period | Calculation | Share |
|---|---|---|---|
| A | 30,000.00 | 10,000.00 × 30,000.00 ÷ 40,000.00 | 7,500.00 |
| B | 10,000.00 | 10,000.00 × 10,000.00 ÷ 40,000.00 | 2,500.00 |
| C | 0.00 | No usage cost, so no share | - |
| Total | 40,000.00 | 10,000.00 |
Hours Based
Each destination project’s share is in proportion to the resource hours posted to it in the period.
- The basis is the
Quantityof usage entries of typeResourceposted to the project, with a posting date in the period. - Projects with no resource hours in the period get no share, and no journal line.
- If none of the destination projects have resource hours in the period, the run creates no journal lines and tells you that there is no hours basis.
Formula
Project share = Source total × Project resource hours ÷ Total resource hours of all destination projects
Example
The source total is 6,000.00.
| Project | Resource hours in the period | Calculation | Share |
|---|---|---|---|
| A | 120 | 6,000.00 × 120 ÷ 200 | 3,600.00 |
| B | 60 | 6,000.00 × 60 ÷ 200 | 1,800.00 |
| C | 20 | 6,000.00 × 20 ÷ 200 | 600.00 |
| Total | 200 | 6,000.00 |
Note
The hours-based method adds up the quantity on resource entries as it is posted. Make sure that the resources you post to projects use a time-based unit of measure, such as hours. Otherwise, the shares do not reflect time spent.Rounding
Each share is rounded to the Amount Rounding Precision in General Ledger Setup. Any rounding difference is added to the project with the largest basis, so that the shares always add up exactly to the source total. If two or more projects share the largest basis, the difference goes to the one with the lowest project number.
Formula
Rounding difference = Source total − Sum of all rounded shares
Share of the project with the largest basis = Its rounded share + Rounding difference
Example
The source total is 1,000.00, and three projects each have 10 resource hours.
| Project | Hours | Calculated share | Rounded share | Final share |
|---|---|---|---|---|
| A | 10 | 333.3333… | 333.33 | 333.34 |
| B | 10 | 333.3333… | 333.33 | 333.33 |
| C | 10 | 333.3333… | 333.33 | 333.33 |
| Total | 30 | 999.99 | 1,000.00 |
The rounding difference is 1,000.00 − 999.99 = 0.01. All three projects have the same number of hours, so the difference goes to project A, which has the lowest project number.